Walls/Fences

Perimeter fences must not exceed 2 meters in height except at the back which can be 9 meters maximum..

Vehicular Regulations

All vehicles of residents are required to have THAI stickers...

Teoville East Gate

Teoville East & West Subdivision Parañaque

Environmental Regulations

The Village and its residents shall promote a balanced ecology and shall protect against the degradation of the environment.

Aug 7, 2013

Administrative and Construction Guidelines (Part 3)

IX.  ADMINISTRATIVE and CONSTRUCTION GUIDELINES (Part 3)
      

  b.   Membership
        
        Penalty for non-payment of monthly dues:
     
        The Board of Directors in case of any delinquency or default of Association dues may take
        measures such as, but not limited  to the following:
     
        1)   Putting in conspicuous place/s the names of delinquent members.
        2)   No services by maintenance men and security guards.
        3)   Annotation of land title.

7.   Period of Restriction

      All the restrictions, easement, reservations and conditions enumerated herein shall be valid
      and binding.  Such restrictions may be added to but not diminished, amended or changed
      by the INCUMBENT BOARD OF DIRECTORS and other governing body of the village,
      provided that the use and occupancy of lots for residential purposes by a single family
      only shall not be changed.

8.   Enforcement of Restrictions

      THAI and its duly authorized representatives shall have the right during reasonable hours
      of the day to enter and inspect any building under construction to ascertain compliance
      with all the regulations and restrictions on construction.

9.   Interpretation of Restrictions

     When there appears to be a conflict in the interpretation of these restrictions and/or
     guidelines, the most equitable interpretation shall be adopted.

10.  Refund of Construction Bond

      THAI will not issue its final certification of clearance nor release the construction
      bond until all requirements have been satisfactorily met.

     THAI will refund seventy percent (70%) of the construction bond without interest after
     100% completion of the project.  The term 100% shall mean completion of the house
     in accordance with approved plans and specifications, completely painted, its services,
     utilities and permanent fixtures installed and ready for immediate use and occupancy
     and a Certificate of Occupancy has been secured from the proper government agency.

  Source:  Teoville Homeowners Code of Discipline
                Deed of Restrictions Rules and Regulations 

Aug 5, 2013

Administrative and Construction Guidelines (Part 2)

IX.   ADMINISTRATIVE and CONSTRUCTION GUIDELINES (Part 2)

5.   Conditional Provision

       All drainage (sewer and run-offs) must be connected directly to the subdivision underground
       drainage system.  If drainage, sewerage and/or other utilities are affected by a house expansion,
       then the repair cost and/or relocation cost will be shouldered by the homeowner.

6.  Fines and Penalties


                Source:  Teoville Homeowners Code of Discipline
                Deed of Restrictions Rules and Regulations 

IX.   ADMINISTRATIVE and CONSTRUCTION GUIDELINES (Part 2)



Aug 4, 2013

Administrative and Construction Guidelines (Part 1)

IX.   ADMINISTRATIVE and CONSTRUCTION GUIDELINES (Part 1)

1.   Workers' ID/Delivery of materials
     
     That should any construction activity commence without the necessary permit
     and consent of the THAI, the later may have the prerogative to:

     a.  Refuse issuance of IDs to workers.
     b.  Stop the ingress through the security of any delivery materials at the village gates.
     c.  Stop construction should any activity commence without construction approval
          should there be any buildings violation.

2.   Submission of Plans

     Construction and improvements/additional structures (including trellises, gazebos, roofs,
     sheds, swimming pools and filter housings, guardhouses, storerooms, greenhouses which
     are semi or fully enclosed) shall require THAI approval.

3.   Charges:






















4.   Permits and Clearances

     a.  Building Permint
          
          Compliance with all THAI existing rules and regulations with existing municipal, provincial
          or national government regulations is the responsibility of the lot owner and building
          contractor.  Village requirements for construction may be obtained from the THAI office.

     b.  Stockpiling on Vacant Lots

          Stockpiling is authorized only on one's lot.  The THAI has no authority to permit anyone
          from using adjacent lots without the owner's permission and will not accept responsibility
          or liability for such use.  Stockpiling on the street is likewise not allowed.

     c.  Work Hours

          Official work hours are 7:00 a.m to 5:00 p.m.  Mondays to Saturdays. Overtime work
          beyond 5:00 p.m. requires prior approval from THAI and will be treated on a case 
          to case basis.  THAI approval is required for overtime on Sundays, legal and  non-working
          holidays.

     d.  Stay-in-Workers

          The THAI general rule is that ingress of construction workers is not permitted between
           8:00 p.m. to 6:00 a.m.  However, in case where the construction is to be secured or for
          practical reasons, a maximum of 4 persons per project may be allowed subject to THAI
          terms and conditions.  Any number of persons exceeding the maximum limit and without
          a permit shall be subject to penalties and fines.

     e.  Construction workers' I.D.s

          All workers must secure their THAI IDs prior to any construction activity.  IDs must be
          worn at all times.  Penalties and fines will be imposed on workers who use IDs assigned
          to previous construction sites or residences.  Workers with expired IDs or found without
          the same maybe charged with illegal entry and shall be dealt with accordingly.

     f.  Delivery of Materials
         
         Toll free deliveries of materials shall be from Mondays to Saturdays, 7:00 a.m. to 12 midnight.
         No deliveries shall be allowed after 12 midnight until 7:00 a.m.  While deliveries may be
         allowed on Sundays and legal holidays from 7:00 a.m. to 5:00 p.m., a toll fee of Ph300.00
         shall be imposed on a per vehicle basis.  Authorised deliveries made by 10 wheeler trucks
         and container vans will be charged Ph 1,000.00 per entry.



     Source:  Teoville Homeowners Code of Discipline
                       Deed of Restrictions Rules and Regulations


IX.   ADMINISTRATIVE and CONSTRUCTION GUIDELINES (Part 1)